If you run a site, you need to know what turns up and what paperwork comes with it. This page is for builders, site supervisors and principal contractors. Anything here is available for your site file — just ask.
What We Hold
Before Every Dig
We lodge a Before You Dig Australia enquiry for the site and have the plans on site before excavation starts. Marked services are located and exposed by hand or by non-destructive potholing before the bucket goes near them.
On a dry hire, identifying and disclosing underground services is the hirer’s responsibility under our hire agreement. On operated work and contract earthworks it is ours. Either way, if you know about something under the ground — an old septic line, irrigation, garden lighting, a previous owner’s drainage — tell us, because private services are usually on no plan at all.
Where We Draw The Line
Worth stating plainly, so it is not being discussed for the first time on site with the clock running.
What We Need From Your Site
Underground and overhead services identified before we deliver. Safe, level ground to unload on. Your site induction, safety plan and traffic management requirements if the site is a construction project, and the name of the principal contractor. A site contact reachable on the day.
Operator Licensing In Victoria
No high risk work licence is required in Victoria to operate earthmoving plant such as a mini excavator on private property. That is not the same as saying anyone can run one. Excavation is high risk construction work, and if you are the principal contractor you carry duties under the Victorian OHS Regulations regardless of who is holding the levers. We will ask about operator experience before releasing a machine on dry hire — it is not a formality.
SWMS, pre-start records and insurance details are available on request for your site file. Call Aime on 0411 743 494 or email admin@ladbrokeshire.com and say what your site needs.