Skip to content

If you run a site, you need to know what turns up and what paperwork comes with it. This page is for builders, site supervisors and principal contractors. Anything here is available for your site file — just ask.

What We Hold

Pre-start on every machine
A documented pre-start inspection is completed before every hire — hydraulics, tracks, controls, guarding, fluid levels and safety systems, recorded on form LH-FRM-01. If it does not pass, it does not leave the yard.
SWMS — mini excavator
LH-SWMS-01 covers mini excavator operation and auger drilling. Movement of powered mobile plant is high risk construction work under the Victorian OHS Regulations, and this is the statement for it.
SWMS — excavation
LH-SWMS-02 covers excavation and trenching: ground collapse, service strikes, spoil placement, edge protection, access and egress, and working near structures.
Tickets
Construction Induction Card (White Card) and EWP licence. Operators are assessed as competent on the specific machine and attachment before working unsupervised.

Before Every Dig

We lodge a Before You Dig Australia enquiry for the site and have the plans on site before excavation starts. Marked services are located and exposed by hand or by non-destructive potholing before the bucket goes near them.

On a dry hire, identifying and disclosing underground services is the hirer’s responsibility under our hire agreement. On operated work and contract earthworks it is ours. Either way, if you know about something under the ground — an old septic line, irrigation, garden lighting, a previous owner’s drainage — tell us, because private services are usually on no plan at all.

Where We Draw The Line

Worth stating plainly, so it is not being discussed for the first time on site with the clock running.

Trenches over 1.5m
A trench or shaft deeper than 1.5 metres is high risk construction work. Nobody enters one unless it has been battered, benched, shored or shielded, or an engineer has signed the ground off. We do not own shoring equipment, so work needing ground support has it specified and hired in at quoting time — not discovered halfway down.
Near structures
Excavating below an adjacent footing, or within a metre of a structure or boundary, needs written engineering advice on ground support before we start. Loss of support is how neighbours end up in dispute.
Pressurised services
We do not work on or near pressurised gas mains or chemical, fuel or refrigerant lines. That is separate high risk work requiring the asset owner’s involvement.
Stop work
If a trench wall cracks or seeps, an unmarked service turns up, rain makes the ground unstable, or the operator is not confident it can be done safely, work stops. That is not a breach of any agreement with us — it is written into them.

What We Need From Your Site

Underground and overhead services identified before we deliver. Safe, level ground to unload on. Your site induction, safety plan and traffic management requirements if the site is a construction project, and the name of the principal contractor. A site contact reachable on the day.

Operator Licensing In Victoria

No high risk work licence is required in Victoria to operate earthmoving plant such as a mini excavator on private property. That is not the same as saying anyone can run one. Excavation is high risk construction work, and if you are the principal contractor you carry duties under the Victorian OHS Regulations regardless of who is holding the levers. We will ask about operator experience before releasing a machine on dry hire — it is not a formality.

SWMS, pre-start records and insurance details are available on request for your site file. Call Aime on 0411 743 494 or email admin@ladbrokeshire.com and say what your site needs.

Ladbrokes Hire Pty Ltd ATF Ladbrokes Business Trust · ABN 76 394 887 900
3/313 Bellerine Street, South Geelong VIC 3220 · 0411 743 494
Back To Top